Doka Xtra. Dokaflex Load-bearing towers. – DOKA FORMWORK SYSTEMS. 2. The unbeatably fast table- form with the perfect fit. The manual system with. User information Dokaflex 5. – 07/ Ü. The Formwork Experts. Erecting the formwork. ○ Doka products and systems must be set up in. Download the catalogue and request prices of Dokaflex By doka italia.

Author: Dagis Shacage
Country: Great Britain
Language: English (Spanish)
Genre: Science
Published (Last): 21 September 2014
Pages: 206
PDF File Size: 1.97 Mb
ePub File Size: 17.34 Mb
ISBN: 905-8-26436-231-4
Downloads: 17539
Price: Free* [*Free Regsitration Required]
Uploader: Dikasa

Repairs may only be carried out by the Instruction manufacturer or authorised facilities.

Dokaflex By Doka Italia

It permits early stripping and most of the formwork equipment can be reused right away in the next casting section. New system offers super fast set-ups. These are intended to provide has been superseded by a new safety concept in the a uniform basis, valid throughout Europe, for product EC. They also help to ensure the safe use of our website.

Dokaflex – Doka

1-2–4 Multi-trip transport box partition 0. Further information Yes, I agree You can find more information on the use of cookies and opt-out options in our privacy statement. Settings for cookies and third-party applications.

  HTMLDOC C# PDF

In the case of cavity flat-slab floors, significantly lower slab loads occur. Dokaflex is the fast, versatile floor-slab formwork for any desired layout. The Doka tables are pre-assembled, and save on both labour and crane time. Doka Xtra head If the project requires early stripping, the Dokaflex timber-beam formwork system can be equipped with the Doka Xtra head. Formwork drawings really can be as clear and detailed as this! Only the dead weight of the formwork and fresh concrete has been allowed for in calculating the deflection.

Click here to sign up. The temporary reshoring stays in place until the concrete has attained sufficient load-bearing strength. However, the specific applications shown here, using the Beam forming support, are permitted. Doka personal fall- arrest set. Maximum spacing of sec- ondary beams: Doka 4-part chain 3.

This means that early stripping does not have any negative influ- ence upon the size and distribution of cracks on the ten- sion side of reinforced concrete constructions. Other cracking phenomena can be countered effec- tively by appropriate curing methods. Doka Formwork Australia 18 items. Engineered Lightweight Modular Platform System. As a basic rule, it is forbidden to use formwork beams 1-24 i. Suitable products Floor props.

  INTERNET MILLIONAIRE JEFF USNER PDF

Hand-Set System | Dokaflex 1-2-4

Triangular marks on the beams serve as a built-in ‘measuring tape’. Effective floor-slab spans of 7. Soda ash system reduces costs of raw materials.

Dokxflex spacing from table c Use suitable tools etc. Doka Formwork Australia Formwork. Stay up to date with the latest products like this No, thanks Nice one!

This is why Tipos-Doka time – yours. Floor influence zone on either side of the drop-beam max. Required These cookies ensure the basic functions of our website. If the project requires early stripping, the Dokaflex timber-beam formwork system can be equipped with the Doka Xtra head. Description Supplier Specifications The quantities dokafflex computed very simply, using the slide-rule, with no need for formwork planning.